The shower glass installation process in Dubai starts well before anyone fits glass. Most of the work is measuring, choosing and confirming, because the glass is made to fit your bathroom and cannot be trimmed on site.
Quick answer: the process has four stages. You send photos and approximate sizes, the opening is measured, the design and specification are agreed, and the glass is fabricated and installed. The bathroom should be tiled and ready before fitting.
This guide explains each stage so you know what to prepare. For the service itself, see Blue Lake’s custom shower glass in Dubai page.
Stage 1: send photos and approximate sizes
Start with a few photos of the bathroom and the shower area, plus rough widths and heights. Say which style you have in mind, such as frameless, framed, sliding, hinged, a fixed panel or a bathtub screen. You do not need exact numbers at this point. The first conversation only decides whether the idea suits the space.
Stage 2: site measurement
Shower glass is made to measure, so the opening is checked on site. The measurement looks at the width and height of the opening, the wall and floor condition, and where the door will swing or slide. Tiles, a shower tray and the position of taps and fittings all affect the plan.
Walls are rarely perfectly straight. A site visit finds these small differences before the glass is cut. Our guide to small bathroom shower enclosures shows how room size changes the layout.
Stage 3: agree the design and specification
Before fabrication, the choices are confirmed in one place. These are the points that matter most:
- The style: frameless, framed, sliding, hinged, fixed panel or bathtub screen.
- The glass thickness. Blue Lake’s shower glass page lists 8, 10 and 12 mm options, and large panels or unusual openings can need a different specification.
- The hardware finish for hinges, handles and fittings.
- Edges, holes and cut-outs, which are prepared before the glass is tempered.
The page states that tempered safety glass is used for shower enclosures. If you are still undecided, read our comparison of frameless and framed shower glass first.
Stage 4: fabrication and installation
Once the specification is confirmed, the glass and hardware are prepared. Tempered glass cannot be cut or drilled afterwards, which is why every dimension is confirmed first. On installation day the glass is positioned, the hardware is fixed and the door is aligned so it opens or slides smoothly.
Timing depends on the size of the job and on site conditions, so ask for a schedule once the design is approved.
Should tiling be finished first?
Yes. As a general rule, tiling should be complete before shower doors are fitted. This gives a neat, waterproof finish and a firm surface for the fixings. Tell the team if your tiling is still in progress, because measurements taken on unfinished walls may need to be checked again.
How to prepare your bathroom
- Finish tiling and any waterproofing work in the shower area.
- Clear the space so the opening can be measured and the glass can be carried in.
- Decide the style and hardware finish you want before the visit.
- Note where the door should open and whether anything blocks it.
- Keep photos of the bathroom ready to send.
Common mistakes to avoid
Ordering from rough numbers is the most common problem. A few millimetres matter when glass is fixed to tiled walls. Another mistake is choosing the style from a photo without checking door clearance. A sliding door suits a tight bathroom, while a hinged door needs room to swing. Our guide to sliding shower doors covers that choice.
What happens on fitting day
In general, the finished glass and hardware are brought to the bathroom on installation day. The glass is positioned against the measured opening and fixed with the chosen hardware, and the door is adjusted so it closes evenly and moves smoothly. The exact steps depend on the system and the site.
Before you sign off, open and close the door a few times, look at the gaps along the edges and check the handle position. Ask about care instructions too, such as how to wipe the glass after use, so the finish stays clear. Our article on shower glass water spots gives simple cleaning habits.
Who should be at home
Someone should be able to open the bathroom and confirm small decisions, such as the exact handle height. If you are not available, name a person who can decide on your behalf. Clear communication on the day avoids a second visit.
Timeline in plain terms
Think of the process as a sequence with one pause. You send information, the opening is measured, you approve the design, and then the glass is made. The pause is fabrication, because made-to-measure glass cannot be rushed or adjusted afterward. Ask for the expected timing at the approval stage, and plan other bathroom work around it so tiling and plumbing are finished before the glass arrives.
Cost factors
The cost depends on the size, the style, the glass thickness and the hardware. Prices start from AED 1,000. The final price depends on the size, design, materials, and installation requirements. To start, contact Blue Lake and send photos of your bathroom.
Frequently asked questions
The timeline depends on the size, the specification and site conditions, and it is confirmed after the design is approved.
Someone should be able to give access to the bathroom and confirm the style and door direction. The measurement checks the opening, the walls and the fixing surfaces.
Tempered glass cannot be cut or drilled after tempering. That is why dimensions, holes and cut-outs are confirmed before fabrication.
Yes. Tiling should be finished first so the glass is fitted to the final surface and the finish stays neat and waterproof.
Send photos of the bathroom, approximate dimensions and the style you prefer. Blue Lake then arranges a site measurement where needed.